Skip to content
POWERbuilder.

POWERbuilder · EVC Cover

EVC Cover – All RiskFor existing EVC Shields

For already installed EVC Shields – no hardware order. Insurer: ERGO Versicherung AG.

Step 1 / 4

Country block 1

Premium basis is CCS cables; number of Shields is not automatically number of chargers. The site count is sufficient here; count each physical site once in its country block. Address of installed EVC Shields, installation date, quantity of EVC Shields and sum insured are collected later via upload/backoffice at actual registration: four quarterly reports with annual premium reconciliation.